The obvious part of a phone migration is the handset on your desk. The overlooked part is often equipment elsewhere in the building.
Walk the site, then check the bills
Look for alarm communicators, lift telephones, older card terminals, fax machines, franking equipment, entry systems and devices used for emergency calls. Match physical equipment to billed services and record the responsible supplier.
Ask how each device connects
Some equipment already uses internet or mobile data. Other devices still signal over traditional analogue lines. A working plug or adapter does not prove compatibility with a replacement service.

Bring the specialist into the plan
Alarm, lift and telecare equipment may require approved replacement hardware, a different signalling path, power backup and specialist testing. Ask the maintainer to confirm what is suitable; a normal VoIP extension is not automatically an acceptable replacement.
Plan for loss of power
Digital calling and its network equipment need power. Review which devices need backup and what should happen during a prolonged fault. An alternative internet connection helps with some outages but does not replace a power plan.
Do not wait for the final date
Openreach gives 31 January 2027 as the PSTN retirement deadline. Your provider may move your services earlier. This is not a universal shutdown of every copper-based broadband product.

